Vice President Alhaji Aliu Mahama on Tuesday cut the sod for the commencement of the ¢187.3 billion Sogakope-Adidome road, which is the first phase of works on the 45 kilometre-road linking Ho-Fume.
The project, solely funded by the Government involved reconstruction of a two-lane single carriageway bituminous surfaced road from Sogakope to Adidome, covering a distance of 30-kilometres for the first phase.
The contract to be executed by Messrs Rolider Limited was expected to be completed by June 2008.
Vice President Mahama described the project as a crucial link to the National Routes (NI/ N2).
He said the Sogakope-Adidome-Ho Road would link Keta, South Tongu, North Tongu and Adaklu-Anyigbe districts to the Volta Regional Capital-Ho, while the Ho-Fume road would also link Fume, Vane, Dzolokpuita and Matse Wegbe to Ho.
“It is very unfortunate to note that while we strive to improve the quality of our roads, some heavy duty vehicle operators are contributing to the gradual deterioration of the country’s road network."
Vice President Mahama stressed: “Some vehicle operators overload their vehicles beyond the permissible 11.5 ton per axle load weight. There has even been an instance where such overloaded vehicles have caused considerable damage on some portions of our roads.”
He said overloading of vehicles put pressure on road surface and contributed to accidents.
“I therefore charge the Highway Patrol Unit of the Police Service to intensify its work in order to bring under control the rising cases of overloading of vehicles.
“The Ghana Highway Authority must also intensify its axle load control programme on the roads to help curb the menace of overloading on our highways.” he said.
The Deputy Minister of Transportation, Mr. Magnus Opare-Asamoah, assured motorists and communities living along the project sites that environmental, safety and traffic management measures would be put in place to minimise the expected inconveniences that they may be exposed to.
Mr. Kofi Dzamesi, Regional Minister said the project had been on the drawing board since 1992.
“Development projects that have been going on in the Volta Region for the past six years are unprecedented. From the Southern part of the region through the mid to the Northern part of the region, there is so much going on and happening by way of socio-economic development,” he noted.
Mr Dzamesi said Keta, Ketu, Akatsi, South Tongu, Kpando and Hohoe have been listed to benefit from the multi-million dollar Millennium Challenge Account, while facilities at Adidome Senior Secondary School have been upgraded to include a new science laboratory, a three-storey boys and girls dormitories, kitchen and dining hall.
Source GNA
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
Latest Stories
-
Union Ghana triumphs in inaugural University of Ghana Community Games
3 hours -
GPL 2024/25: Young Apostles look to upset Samartex in Samreboi
3 hours -
GPL 2024/25: Medeama aim to halt GoldStars’ unbeaten run in Western derby
4 hours -
AFCON 2025Q: Jordan, Alidu, Gideon and Fatawu ruled out of Niger’s clash
5 hours -
Developing countries need $1 trillion annually by 2030 to combat climate change, new report warns
7 hours -
NALAG elect Alfred Aseidu Adjei as new president
7 hours -
If I focused on self-promotion, my statues would be everywhere – Mahama
7 hours -
GPL 2024/25: Nsoatreman draw 1-1 against Aduana in Bono derby
7 hours -
Don’t be used for electoral misconduct, you would be dealt with – IGP warns
7 hours -
Prof Ato Duncan to launch blueprint for sustainable global peace
10 hours -
Southwest flight struck by bullet at Texas airport
10 hours -
Malcolm X’s family sues FBI, CIA and NYPD over his murder
10 hours -
BCI takes free breast cancer screening to Mampong Okuapeman
10 hours -
Measuring the Green Wealth of Nations: Natural capital and economic productivity in Africa
10 hours -
COP29 protest: Global call for plant-based treaty gains momentum
11 hours