A state of the art Seawater Pumping Station Project, built by Technofab Engineering Limited (TEL), an Indian Company, was on Saturday handed over to the Tema Oil Refinery at a ceremony in Tema.
It took TEL 27 months to complete the 12.6 million dollar project which was contracted to it in April 2007.
It consists of the pumping station and a new fiberglass pipeline to replace the existing concrete bonna pipe, installed over 45 years ago.
The pipeline which is approximately 5.5 kilometres in length stretches from the Tema fishing harbour to the refinery, made of fiberglass, a material resistant to seawater corrosion.
Recounting the history of the project, Dr Kwame Ampofo, Acting Managing Director of TOR, said in March 2005, fire destroyed the then existing seawater pumping station which served the refinery.
Dr. Ampofo said after the loss of the pump station, the refinery resorted to the use of municipal water for its operations, which he said was very expensive.
He said as a result, Management thought it wise to re-install the seawater pumping station, in order not only to have sufficient water available for firefighting, but to also hydrotest newly constructed storage tanks, and flash wash pipelines.
The ultimate objective, he said, is to improve the refinery’s risk profile, thereby reducing the insurance premium on its assets.
Mr O. N. Vij, Senior Vice President of TEL, who handed over the project to TOR, hoped it would serve its intended purpose.
Source: GNA
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
Latest Stories
-
Ken Thompson applauds John Mahama’s initial ministerial appointments
3 minutes -
Shatana drops new single “Monicitamol” to inspire women
15 minutes -
Mahama calls on party supporters, and others fomenting trouble to act responsibly
17 minutes -
We’ll have 2 holidays for Eid al-Fitr celebrations this year – Mahama
22 minutes -
Effiduasi market women hit streets in demand for access to stalls after paying contractor
43 minutes -
GNAT urges gov’t to prioritise education sector challenges just as it’s tackling energy issues
46 minutes -
Free SHS can’t continue; parents must pay for feeding, accommodation – NAGRAT President
51 minutes -
Mahama demands update from IGP on election-related deaths in 2020, 2024
57 minutes -
It’s a boy! Moses Bliss and wife welcome first child
1 hour -
Motorists stranded as fuel shortage hits Damongo
1 hour -
Fuel shortage hits Yendi and Damongo, residents appeal for swift intervention
2 hours -
Prof Bokpin endorses Finance minister-designate’s push for additional IMF funding
2 hours -
Sammy Crabbe criticises NPP leadership for party’s defeat; eyes chairmanship in 2026
2 hours -
There’s no formula for how a President decides to roll out his appointees – Dr Osae-Kwapong
2 hours -
Parliament suspends sitting for committee to vet ministerial nominees; orient new legislators
2 hours