The Ghana Water Company Limited (GWCL) is carrying out emergency maintenance works on its 42-inch and 21-inch transmission pipelines from the Kpong Water Treatment Plant.
Announcing the maintenance works, the management of GWCL, Tema Region, indicated that the works would be carried out by GWCL engineers from Wednesday, January 10, to Thursday, January 11.
This, it noted, would lead to some interruption in water supply for the two scheduled days the work would be done.
Management indicated that the areas that would be affected by the water supply interruption included the whole of Tema Township, Prampram, Dawhenya, Devtraco, Community 25, Ashaiman, Gbetseli, Afienya, and their immediate environs.
Residents in these areas are therefore advised by the management to store enough water for the period indicated.
It gave the assurance that the water supply would be restored to normalcy as soon as the works were completed.
Latest Stories
-
NPP’s campaign is going very well – Nana Akomea
8 mins -
Employees must file annual income tax returns – Ghana Revenue Authority
30 mins -
Does the Police law empower police to run a broadcasting service?
1 hour -
GFA dissolves Black Stars Management Committee after AFCON qualification disappointment
1 hour -
The Thomas Partey Tournament: Empowering Ghana’s Youth through football
2 hours -
Nana Akomea calls for public inquiry into ‘expired rice’ saga
2 hours -
Maintain Otto Addo despite AFCON 2025 no-show – Nana Akomea advises GFA
2 hours -
GFA issues apology to Ghanaians for Black Stars failure to qualify for AFCON 2025
3 hours -
Nautyca releases new single ‘Nalani’
3 hours -
Ablakwa slams Chief of Staff for ‘whitewashing’ ‘expired rice’ for SHS scandal
3 hours -
Regulators of financial institutions urged to develop policy framework for climate financing
3 hours -
Akufo-Addo: New BoG HQ to enhance reform capacity and investment climate
4 hours -
DRIP initiative improves over 80km of roads in Greater Accra, says RCC
4 hours -
Akufo-Addo to commission over 80 educational projects today
4 hours -
Police to set up Election Task Force Briefing Centre for 2024 polls
4 hours