Heavy rains have battered parts of South Africa, submerging whole neighbourhoods and flooding coal mines and power stations in a nation already hit by electricity blackouts.
At least 700 homes have been washed away near the capital, Pretoria, public broadcaster SABC reported.
The state-run power utility warned of further electricity cuts, saying heavy rains had affected its operations.
The cuts have halted gold and diamond production at some leading mines.
Harmony Gold said it had called off underground shifts because of the power cuts, known as load shedding in South Africa.
Petra Diamonds said it was "removing all people from underground, except those required for essential services, with only pumping to prevent flooding and ventilation for safety being allowed".
State-run power utility Eslom said 6,000 megawatts of electricity - roughly 10% of the grid - was being switched off.
It said flooding at a coal mine and power station had disrupted supplies to homes and businesses.
"The outlook for this week is to maintain load shedding because of the weather, because of the coal handling challenges that we've got," Eskom's chief operations officer Jan Oberholzer told the privately owned eNCA news channel.
South Africa's economic heartland has been worst affected by the heavy rains
South Africa's weather bureau has warned of further flooding in the economic heartland of Gauteng and several other provinces.
The banks of two rivers burst, submerging about 700 homes built with flimsy material in the poor neighbourhood of Mamelodi, east of Pretoria, SABC reported.
The emergency services had rescued people who had climbed on to the roofs of homes and cars to escape rising water levels on Monday, city officials said.
One person had died in the floods, the officials added.
South Africa is the latest African state to be hit by floods. Almost 300 people have died and 2.8 million people have been affected by recent floods in East and central Africa, according to the UN Office for the Co-ordination of Humanitarian Affairs.
Meanwhile, South Africa's main opposition Democratic Alliance (DA) has criticised President Cyril Ramaphosa for flying to Egypt in the midst of power cuts.
"Ramaphosa is greatly mistaken if he thinks he can run a country and manage this crisis via a cell phone. This requires bold leadership, not platitudes," DA interim leader Johan Steenhuizen said.
Earlier, Mr Ramaphosa acknowledged that years of corruption and mismanagement lay behind Eskom's troubles.
He insisted the government was taking the necessary steps to fix Eskom and other state companies like the national airline, which is now teetering on the brink of bankruptcy.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
Latest Stories
-
Investors don’t find Ghana’s oil field or upstream sector attractive anymore – Nana Amoasi VII
1 hour -
We’ll not accept these unscrupulous acts – Kwesi Kwarteng on alleged distribution of expired rice to SHSs
2 hours -
Frimpong Manso wins NASCO Coach of the Month award for October
2 hours -
Kotoko’s Albert Amoah wins NASCO POTM for October
2 hours -
Paradox of Elitism: Why Ghana’s brightest minds fall short in leadership
3 hours -
EPA, UNESCO to advance plan to guard Lake Bosomtwe from further degradation
3 hours -
The Great Exodus: How Ghana’s best and brightest are trapped in a cycle of modern slavery
3 hours -
Ronica Sings returns with ‘Covenant Keeping God’
3 hours -
The Uneven Path Toward Cheaper Digital Remittances: A Focus on Ghana
3 hours -
Ogagus nominated A&R of the Year at the 2024 Beatz Awards
3 hours -
Is Ghana on the brink of becoming a failed state?
3 hours -
There is no order against The Speaker – Thaddeus Sory
3 hours -
I have observed his good and unifying conduct – Kufuor on Bawumia
4 hours -
Bawumia’s understanding of technology and global trends is what we need as a country – Kufuor
4 hours -
It is the way to go – ex-President Kufuor hails Bawumia railway development plan
4 hours