President Nana Akufo-Addo has inspected the completed “one-village-one-dam” project constructed in Namoligo in the Talensi constituency of the Upper East Region.
Accompanied by the Upper East Regional Minister, Paulina Abayage, and the Agriculture Minister, Dr Owusu Afriyie-Akoto, President Akufo-Addo was told that the construction, in fulfilment of the 2016 manifesto pledge of the New Patriotic Party (NPP), was undertaken by the Ghana Irrigation Development Authority (GIDA).
The Namoligo Dam is one of 10 small dams which have been completed by government through GIDA/Ministry of Food and Agriculture. The contract for the construction of the Dam was awarded in May 2019 and has been substantially completed.
With the project costing ¢2.5 million, the Namoligo dam has a water storage capacity of 145,300 cubic meters and has a minimum dam life of 40 years.
The President was told that, for occasional (supplementary) irrigation, the cropping area for vegetables can increase to some 50 hectares, with optimum yields assured, since crops will always get the needed water required for healthy growth throughout the growth stages.
To facilitate water access for irrigation, two outlets, controlled by sluice valves, have been provided at vantage points to allow free flow of water on either side of the valley.
Indeed, GIDA has constructed 10 similar small dams with irrigation outlets in Upper West Region, and the Northern Region, all in support of “One Village One Dam” programme.
The President urged members of the community to take very good care of the dam, and hoped that the Namoligo community and the other 10 communities that are beneficiaries of the dams, will use them for their own benefit.
Since 2017, Government of President Akufo-Addo, in its bid to fulfil the 1-village-1-dam policy, has constructed a number of small-earth dams for water storage, irrigation, and for use by livestock. This is the largest stock of such small earth dams provided since independence.
Thus far, 439 small-earth dams are under construction, and 375 have been completed, and 64 are between 90-100% complete. Each dam provides water for up to five hectares of farmland.
Under the Akufo-Addo government, the Tono irrigation dam has been rehabilitated and rehabilitation projects on both the left and right banks of Kpong are also in progress.
Latest Stories
-
About 95% of PWDs in Obuasi have source of livelihood – MCE
3 mins -
Immigration Service intercepts 54 gallons of fuel
6 mins -
Election 2024: Roman Fada selected as flagbearer for Ghana Freedom Party
14 mins -
Bawumia to launch Ghana’s credit scoring system on Nov. 7
18 mins -
Alan to combat galamsey with strategic youth-centred business model
21 mins -
Agona Swedru chiefs commit to ending child marriage within their jurisdiction
35 mins -
Sunyani Traditional Council endorses Bawumia – NAPO government
37 mins -
Adutwum defends double track in Free SHS, citing research and positive outcomes
42 mins -
‘Prevent and condemn illegal pressure on Judiciary’ – AG to GBA
46 mins -
Mahama alleges biased development allocation by NPP
48 mins -
Do not rely solely on foreign investments for your operations, business told
52 mins -
Boeing strike ends as workers accept new contract
2 hours -
GAF will not relent in its quest to counter external threats – GOC Southern Command
2 hours -
Election 2024: Bawumia reiterates commitment to promote sustainable mining practices
2 hours -
Ensign Global College promotes health and community well-being at Ngmayem Festival 2024
2 hours