The Public Agenda says unless there is divine intervention, the Akosombo Dam, Ghana's economic heartbeat and most valuable asset will be closed down next week.
This follows the alarming rate of the daily drop in the level of water that turns the turbines to generate electricity for domestic and industrial use.
Kwesi Amoako, the Plant Manager of VRA confirmed on an Accra based radio station that there has been a 0.03ft daily drop in the water level for sometime now, which left the dam with just 235.24 feet as at Wednesday, July 10.
At this level, the water was only strong enough to turn two turbines, which has been the case for almost a year now. The minimum operating level of the dam is 240 feet; below this, the dam is at worse, operating at what Mr. Amoako called "the extreme minimum."
At the current level of 235.24, the dam is operating at its lowest level since 1984, when the water dropped to 235.76. But unlike in 1984 when there was a country wide drought, this time the rains are falling alright, but the inflows are still too low for the dam to operate at full capacity.
The Plant Manager said currently only two turbines are in use during the week days, while one is switched on during weekends with power imports from Cote d’Ivoire to beef it up. He says if the trend continues, the VRA will be compelled to operate one machine, which can generate only 135 megawatts, which could worsen the load shedding.
The Dam, according to the paper, can generate 1,020 megawatts, however it is currently producing a mere 270 megawatts with two turbines. The fear is that if the water level does not improve by next Wednesday, the dam could be shut down. But Mr. Amoako put on a brave face in trying to convince the public that all is well with the dam.
When asked at which point the dam would be shut down he said "until signs indicate that we are overstretching the machines beyond their design limit." He explained that the dam will bounce back by the end of July when the rains are expected to hit the highest point.
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
Latest Stories
-
Ghana Shippers Authority addresses Tema port delays, assures of efforts to resolve challenges
32 seconds -
Ensign Global College recieves Presidential Charter
16 minutes -
CODEO expands post-election observation to monitor parliamentary disputes
59 minutes -
Ablekuma North, Dome Kwabenya will have MPs-elect before January 7 – EC
1 hour -
Bills Micro-Credit climax year with durbar and dinner celebration
2 hours -
Lawyer sues Wesley Girls SHS for alleged religious discrimination
2 hours -
Election: We’re not the first EC to re-collate results – Bossman Asare
2 hours -
Kofi Kinaata makes historic comeback with ‘Made in Taadi’ concert
3 hours -
It is unacceptable; EC is becoming a lawless institution – NDC on re-collation justification
3 hours -
24-hour economy in the era of digital currency adoption: Implications on economy in 2025 and beyond
3 hours -
Okaikwei Central Constituency were electoral officials cajoled into declaring wrong person – Asare Bossman
3 hours -
US donates $220k mobile heath clinic van to facilitate medical outreach for Ghanaians
3 hours -
Dining with the Gods… Hands off the Big Chair
3 hours -
Joy FM’s Party in the Park: A day of family fun awaits in Aburi
4 hours -
Mahama urged to stand firm against lobbyists in appointments
4 hours