The Managing Director of the Ghana Airports Company Limited has announced that the newly constructed Terminal 3 of the Kotoka International Airport will become fully operational on September 15.
This will be ahead of its official inauguration by President Akufo-Addo on October 2.
John Dekyem Attafuah said, "Last Monday we started live flights from this airport, we had four flights on Monday, four airlines used here but for Emirates, for example, they came in went to Abidjan and came back in.
Mr Attafuah added, "So that's what we have and today We have had our first arrivals to this terminal and so far all our systems have worked as we had expected and we are very confident that come the 15th of September, we should not have any problems and challenges."
Passenger numbers
The new terminal is expected to handle up to five million passengers a year, with an expansion potential of up to 6.5 million passengers.
At peak hour, the terminal will have the capacity to process up to about 1,250 passengers. A fully automated baggage handling system will also handle 3,500 bags an hour.
The facility will also hold a large retail and commercial area, three business lounges, six fixed links and seven air bridges expandable to eight, and parking space with capacity to handle more than 700 cars.
The airport expansion supports the government's ambition to make Ghana a regional aviation hub.
Details
KIA’s Terminal 3 is a monumental feat of engineering. It has five levels spread across 45,000 square meters and has parking space for 700 cars.
It has six contact stands for Code E aircraft and two remote stands.
At the Departure level, it has 56 check-in desks, 30 passport control centres and eight security lanes.
At the Arrival level, it has 24 immigration counters, four e-gate positions [expandable to eight] and four reclaim devices.
The terminal is equipped with a fully automated baggage handling system to handle both destination and transit luggage at 3,5OO bags an hour.
It has been constructed on a design and build basis by Turkish construction company, Mapa Construction MNH Holdings.
Watch the video below for a tour of the facility:
Latest Stories
-
We’ll reclaim all Groupe Nduom stolen assets – Nduom declares
6 mins -
Center for Learning and Childhood Development Director Dr Kwame Sakyi honoured at Ghana Philanthropy Awards
9 hours -
Asantehene receives 28 looted artefacts
10 hours -
CAF WCL 2024: Ghana’s Thelma Baffour wins title with TP Mazembe
11 hours -
Benjamin Boakye slams politicisation of energy sector issues and ECG’s inefficiencies
11 hours -
Erastus Asare Donkor and Dr Neta Parsram win big at 10th Mining Industry Awards
11 hours -
Government is “suppressing information” about power sector challenges – IES Director
11 hours -
Majority of our debts caused by forex shortfall – ECG Boss
12 hours -
Pan-African Savings and Loans supports Ghana Blind Union with boreholes
12 hours -
Bole-Bamboi MP Yussif Sulemana donates to artisans and Bole SHS
12 hours -
Top up your credit to avoid potential disruption – ECG to Nuri meter customers
12 hours -
Dutch & Co wins 2024 Entrepreneur of the Year Award
13 hours -
We’ll cut down imports and boost consumption of local rice and other products – Mahama
15 hours -
Prof Opoku-Agyemang donates to Tamale orphanage to mark her birthday
16 hours -
Don’t call re-painted old schools brand new infrastructure – Prof Opoku-Agyemang tells gov’t
17 hours