A portion of the Achimota overhead bridge has developed a large and deadly pothole which is exposing road users on that stretch to danger.
An open hole through which one can even see the road beneath the bridge is gradually enlarging as pieces of the concrete component of the structure breaks in bits and drops directly atop moving vehicles below the bridge.
Unsuspecting drivers using the bridge, sometimes drive through this pothole causing it to break further into pieces of stone either dropping directly onto the road or on top of moving vehicles.
Below is Joy News' Maxwell Agbagba's video report:
DISCLAIMER: The Views, Comments, Opinions, Contributions and Statements made by Readers and Contributors on this platform do not necessarily represent the views or policy of Multimedia Group Limited.
Tags:
Latest Stories
-
NDC Obuasi East MP-elect hails Supreme Court decision on re-collation
2 hours -
2024/25 GPL: Kwame Opoku scores on return as Asante Kotoko beat Gold Stars
2 hours -
Philip Nai and friends spend time with kids of Agblezaa on Christmas eve
3 hours -
Education is in crisis – NCPTA General Secretary
4 hours -
Celebrating 65 years of impact: Commonwealth scholars and fellows alumni in Ghana
4 hours -
Our confidence in the law has borne fruits – Ebi Bright on SC ruling
4 hours -
Mandamus application to be heard by new High Court judge – Supreme Court rules
5 hours -
Krofuom residents attack GNFS personnel as fire destroys Trinity TV and church
5 hours -
Movie review: Peter Sedufia’s ‘One Night Guests’
6 hours -
Three dead, several injured in accident on Cape Coast-Accra highway
6 hours -
MTN donates to support two hospitals in Savannah region
6 hours -
NDC victory a call to action for agricultural and economic revitalization in Ghana – Klutse Kudomor
6 hours -
Adidome Chief alarmed over rising teenage pregnancy in Central Tongu, calls for collective stakeholder action
6 hours -
MTN Foundation celebrates Christmas with new mothers across Ghana
6 hours -
MTN Ghana presents hampers to 60 Christmas babies in Central region
6 hours