The Ghana Grid Company (GRIDCo) says it is still working on a transmission line that developed a fault last week.
The repair works have led to some unannounced outages across the country.
A fault in the 330kv transmission line resulted in a ‘partial system collapse’ on Thursday January 21, 2016, plunging almost the whole nation into darkness.
Many people were disorganised by the unfortunate outage on that day.
By close of the same day, power had been restored to the affected areas.
According to a short statement from the Power Ministry, the repair works is causing a system challenge. This led to some parts of the country going off at about midday today 25th January 2016.
But engineers of GRIDCo have however isolated the fault and begun restoring power to the affected areas, the statement indicated.
The Ministry has however apologised for the inconvenience caused by the power outage.
Latest Stories
-
EC hires over 200 experts to assist in election results collation
23 mins -
NDC will protect integrity of election 2024 – Mahama
31 mins -
More youth to enjoy digital skills training – Bawumia
38 mins -
Redesign curriculum to respond to reforms in second cycle institutions – Universities advised
42 mins -
Akufo-Addo elated as GBA inducts first female leader
43 mins -
CSIR-SARI introduces climate-resilient, nutritionally enhanced maize hybrids
45 mins -
Over 5.7m students have benefited from Free SHS since 2017 – Akufo-Addo
47 mins -
I’ve delivered on 80% of our manifesto promises – Akufo-Addo insists
55 mins -
Justice J. C. Amonoo-Monney at 90 years: A nation must honour the most deserving in their lifetime
59 mins -
Republicans edge closer to Senate majority in early results
2 hours -
China’s state secrets leak prompts rare death sentence for ex-employee
2 hours -
Trump wins North Carolina; Harris’ path to victory narrows
3 hours -
UN envoy urges opposition to openly engage with EC and judiciary
3 hours -
‘Quality communication is key’ – UN official advises EC on building trust with voters
3 hours -
Judiciary needs clear communication to avoid misinterpretation, says UN Envoy
4 hours