A Tema bound lowbed truck, loaded with what looks like metal scraps is reported stuck under the Hong Kong footbridge on the George Walker Bush motorway.
According to a Facebook post by the Ghana Police Service, Odorkor MTTD personnel are currently at the scene directing and assisting approaching motorists.
Efforts are under way to remove the vehicle which got stuck about an hour ago.
"Meanwhile, the driver of the truck has been arrested by the police to assist in investigation. Also, Greater Accra, Regional Maintenance Manager, Ghana Highways Authority is at the scene to support Police with on the spot investigations," parts of the post read.
Approaching motorists have therefore been advised to drive cautiously at reduced speed.
"Further updates will be communicated" the Police said.
Latest Stories
-
Joy FM Prayer Summit for Peace ends in electrifying worship and prayer
2 hours -
The Conscience of Leadership: A call to President Akufo-Addo on Ghana’s environmental devastation
2 hours -
Ghanaian youth unaware of their right to hold politicians accountable – Youth Bridge Foundation
3 hours -
Judge delays Trump sentencing for a third time
3 hours -
2024 WAFCON: Ghana drawn against defending champions South Africa in Group C
4 hours -
Photos from DW-JoyNews street debate on ‘galamsey’
5 hours -
Mimmy Yeboah: Blending heritage with global sophistication, confidence redefined through couture
5 hours -
100 Most Influential People Awards 2024: Brain Hill International School’s Director Mary Anane Awuku honoured
5 hours -
Akufo-Addo commissions 97-km Tema-Mpakadan railway line
5 hours -
Majority requests recall of Parliament
6 hours -
Kanzlsperger and Professor Quartey support WAFA with medical Donation
6 hours -
Gideon Boako donates 10 industrial sewing machines to Yamfo Technical Institute
6 hours -
‘Golden Boy’ Abdul Karim Razak honored at WAFU-B general assembly
6 hours -
Buipewura Jinapor secures Vice Presidential position in National House of Chiefs with record votes
6 hours -
2024 election: I want results to come out like ‘milk and honey’ – Toobu
6 hours